Taking Floor Space to New Heights

  1. All storage space had to be fully functional within a tight deadline.  Therefore, project management created a detailed project scope with daily deadlines to keep technicians on track with the ability to adjust due to unforeseen obstacles.
  2. Construction had to be completed without disruption to the client’s flow of operations.  As a result, the majority of the construction was completed during non-business hours to limit disruption to operations.

Summary


The client needed extra space without the overwhelming cost of new construction.  By creating a mezzanine level within the existing vertical area, the result was multiplied storage in a previously under utilized space.  This option enable the client to continue operations without the disruption and expense associated with a full-scale expansion.  The lockable area created a versatile area that could double as an office, if the client’s needs changed again.