Table for “Crew”

CASE STUDY

 

A retail client wanted to changeout their existing store fixtures with updated, new tables.  Resicom was relied upon to build the new tables, properly install the new fixtures, and remove old, damaged tables.  

 

Scope

The scope of work needed to complete this project:

  1. Receive new tables from manufacturer and inspect to ensure shipment is received in excellent condition.
  2. Remove existing worn and damaged tables.
  3. Assemble and install all new tables.  
  4. Dispose of old tables.  

 

Challenges

The challenges of this project included:

  1. Unloading tables is time consuming because of large, awkward packaging.  
  2. Retail merchandise must be moved from old fixture to new with no disruption to layout and visual display. 
  3. The dumpster was not located in close proximity to store, requiring all debris to be carted through the back hallways of mall.

 

Solution

For this project to be successful, Resicom needed to deliver normalcy to the client by swapping the old tables for new without disrupting staff and merchandise.   

Our solution to this project included:  

  1. Dollies and moving carts were used to expedite the easy exchange of old tables for new.
  2. Pictures of the merchandise on the existing table were taken for reference.  After tables were assembled, merchandise was returned to tables according to exact visual display. 
  3. Coordinating the positioning of the dumpster to be situated as close as possible to the mall saved on loading debris into a truck and bringing to an offsite dump.

 

Summary

Resicom delivered normalcy to the client by swapping the old tables for new without disrupting staff and merchandise.  The worn tables were distracting the shopping experience by drawing attention to the disrepair.  The new tables ensured that the customers do not necessarily notice upon what the merchandise was displayed, but rather- focus on the merchandise itself.